Sale! View larger

API RP 95F [ Withdrawn ]

New product

API RP 95F [ Withdrawn ] Gulf of Mexico MODU Practices for the 2007 Hurricane Season - Interim Recommendations (WITHDRAWN - REPLACED BY APPENDIX K TO API 2SK)

standard by American Petroleum Institute, 04/01/2007

More details

$55.00

-56%

$125.00

More info

Full Description

This Recommended Practice supersedes RP 95F, First Edition, May 2006. RP 95 supplements API RP 2SK, RP 2I, and RP2SM for Gulf Of Mexico MODU mooring design, operation, inspection and maintenance practices during hurricane season. Topics addressed in RP 95F that will be part of the overall mooring design and MODU operations include:Mooring AnalysisMooring Design CriteriaConsequences of Failure Indicative GOM hurricane extreme metocean conditionsSite-specific risk assessment and mitigationMooring hardware issues such as anchor system considerations and mooring system improvementsMooring operation issues such as deployment, hurricane preparedness, and inspection

This RP was developed through a cooperative arrangement with the American Petroleum Institute's Subcommittee on Offshore Structures - RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled "US Gulf of Mexico Mooring Strength Reliability" (MODU JIP).

Product Details

Edition: 2nd Published: 04/01/2007 Number of Pages: 42File Size: 1 file , 1.3 MB Product Code(s): G95F02, G95F02, G95F02 Note: This product is unavailable in Cuba, Iran, North Korea, Syria