Sale! View larger

AWWA JAW46187

New product

AWWA JAW46187 Journal AWWA - Communication Strategies for Pipeline Construction

Journal Article by American Water Works Association, 07/01/1997

Price, Neal;Melton, James R.;Stift, Michael T.

More details

$12.90

-57%

$30.00

More info

Full Description

The San Diego County Water Authority has nearly completed a 3.4-mi (5.5-km), 72-in.-(1,830-mm-) diameter potable water pipeline and associated facilities in northwest San Diego County, California. The north county distribution pipeline project includes the pipeline, three flow control and metering facilities, a 1-mil-gal (0.0004 x 10 6-m3) prestressed concrete regulating structure, and a chlorine contact tank. The pipeline parallels and crosses two 24-in.-(610-mm-) diameter potable lines that serve 85 percent of the daily water supply to Oceanside, California. Construction began in March 1995 and concluded late in 1996. Includes figures.

Product Details

Edition: Vol. 89 - No. 7 Published: 07/01/1997 Number of Pages: 7File Size: 1 file , 1.2 MB