New product
Conference Proceeding by ASHRAE, 1987
M. Thedford; M.L. Wallace, P.E.
Warning: Last items in stock!
Availability date:
Monitoring equipment was installed on a residential air conditioning unit to test the effects of a pre-programmed thermostat timer. This was done to determine its effect on the utilityâs load shape for the purpose of avoiding peak generation capacity. This report measured the temperature and energy changes as a result of the test.
Units: Dual
Citation: Symposium, ASHRAE Transactions, 1987, vol. 93, pt. 1, New York, NY